Market Calendar
Miners

Americas Gold and Silver Corporation

USAS · NYSE-A · producer · market cap $1.8B as of 24 Aug 2026

Your watchlist

What Americas Gold and Silver Corporation's own filings say about its costs, margins and results, every figure cited.

Americas Gold and Silver Corporation share price

Company-reported data · Fixed cohorts · No estimated costs

How to read these figures
  • Primary sources: every figure is the company's own, cited to the release or filing it came from.
  • Fixed cohorts: the companies in each median are set for the calendar year, so a median never moves because membership moved.
  • No modelled costs: no cost or margin here is estimated by us; where a company states no figure, the page says so.

About Americas Gold and Silver Corporation

Americas Gold and Silver Corporation is the owner and operator of the Galena Complex in the Coeur d'Alene Mining District of northern Idaho, U.S.A., a silver, lead and zinc producing district. The Galena Complex is 100% owned and is operated through wholly owned subsidiary U.S. Silver Idaho Inc.; it consists of the Galena mine, the Galena processing plant, the Osburn tailings impoundment, the idle Coeur mine and Coeur processing plant, on care and maintenance at the filing date, and the Caladay exploration property. In Mexico, the company owns the Cosalá Operations in east-central Sinaloa, which are 100% owned and operated through wholly owned subsidiaries and consist of the San Rafael mine, the Los Braceros processing plant and tailings storage facility, the EC120 Project and the past-producing Nuestra Señora mine. Silver production at the Cosalá Operations increased 44% in 2025 to approximately 1.2 million ounces, with the majority of second-half production sourced from EC120. The company also owns the Relief Canyon mine near Lovelock, Nevada, on care and maintenance at the filing date, and the Crescent Mine in Idaho, a past-producing underground mine purchased in December 2025 for total consideration of $87 million that produced over 25 million ounces of silver between 1917 and 1981. Since 1953, the Galena and Coeur mines have yielded approximately 238 million ounces of silver, 165 million pounds of copper and 206 million pounds of lead.

40-F · 30 Mar 2026

Costs and margins

Price, quarter average
$73.50/toz
AISC
$40.63/oz
Margin
$32.87/oz
Margin, % of price
44.7%

Latest AISC $40.63 per troy ounce. Silver miners: median AISC $31.29 per troy ounce, Q2 2026, 8 reporters. 7 lowest of 8 silver miners reporting Q2 2026.

-25.000.0025.0050.0075.00100.00Q3 2019Q1 2022Q4 2022Q3 2023Q3 2024Q2 2026
18 quarters, Q3 2019 to Q2 2026. Latest All-in sustaining cost (AISC) $40.63/oz against a $73.50/toz average silver price, a margin of $32.87/oz. Current names, historical figures: today's companies traced backwards, each quarter as the company stated it then; companies since acquired appear inside their acquirer, not as themselves.

All-in sustaining cost (AISC) and the average silver price by quarter, newest first, US$ per ounce; every row cites the company's own release.

Quarter Price avg AISC Margin Margin % Source
Q2 2026 $73.50 $40.63 $32.87 44.7% release
Q1 2026 $84.00 $34.12 $49.88 59.4% release
Q4 2025 $54.10 $34.36 $19.74 36.5% release
Q3 2025 $39.60 $30.06 $9.54 24.1% release
Q1 2025 $31.90 $35.67 -$3.77 -11.8% release
Q3 2024 $29.50 $25.38 $4.12 14.0% release
Q2 2024 $28.80 $19.58 $9.22 32.0% release
Q1 2024 $23.40 $29.20 -$5.80 -24.8% release
Q3 2023 $23.60 $29.55 -$5.95 -25.2% release
Q2 2023 $24.20 $16.78 $7.42 30.7% release
Q1 2023 $22.50 $16.87 $5.63 25.0% release
Q4 2022 $21.30 $14.89 $6.41 30.1% release
Q3 2022 $19.20 $18.66 $0.54 2.8% release
Q2 2022 $22.70 $5.37 $17.33 76.3% release
Q1 2022 $24.00 -$2.67 $26.67 111.1% release
Q4 2021 $23.40 -$14.67 $38.07 162.7% release
Q1 2020 $16.90 -$0.83 $17.73 104.9% release
Q3 2019 $17.10 $23.01 -$5.91 -34.6% release

Its panel on the Miner Margins page carries the cohort it sits in and the basis notes.

Production and guidance

Q2 2026, as reported

Silver produced, attributable
664,971 oz
Prior-quarter silver production
786,925 oz

More ways to compare Americas Gold and Silver Corporation

Reported AISC
Rank 7 of 8View comparable rankings

Americas Gold's mines and operations

OwnershipJurisdictionStatusSource
Galena Complex100% ownedIdaho, U.S.A.Operating40-F (filed 30 Mar 2026); fiscal year 2025
Cosalá Operations100% ownedSinaloa, MexicoNot available40-F (filed 30 Mar 2026); fiscal year 2025
Relief Canyon100%Nevada, U.S.A.Care and maintenance40-F (filed 30 Mar 2026); fiscal year 2025
Crescent MineNot availableIdahoHistorically operated40-F (filed 30 Mar 2026); fiscal year 2025
Coeur mineNot availableNot availableCare and maintenance40-F (filed 30 Mar 2026); fiscal year 2025
San Rafael mineNot availableSinaloa, MexicoNot available40-F (filed 30 Mar 2026); fiscal year 2025
EC120 ProjectNot availableSinaloa, MexicoCommercial production40-F (filed 30 Mar 2026); fiscal year 2025
Nuestra Señora mineNot availableNot availableCare and maintenance40-F (filed 30 Mar 2026); fiscal year 2025
El Cajón mineNot availableNot availableCare and maintenance40-F (filed 30 Mar 2026); fiscal year 2025

Financials, as filed

Key financials

Revenue
$117.9M FY 2025 · 40-F, 30 Mar 2026
Net income
-$87.4M FY 2025 · 40-F, 30 Mar 2026
Operating cash flow
-$3.9M FY 2025 · 40-F, 30 Mar 2026
Capital expenditure
$69.2M FY 2025 · 40-F, 30 Mar 2026
Cash and equivalents
$129.8M FY 2025 · 40-F, 30 Mar 2026
EPS (diluted)
$-0.33 FY 2025 · 40-F, 30 Mar 2026

Rounded from the figures as filed; the exact figures, concepts and filings are below.

Figures as filed, with concept, provenance and filing
Measure Period Value Provenance Filing
Revenue ifrs-full:Revenue FY 2025 $117,934,000 SEC XBRL, as filed 40-F · 30 Mar 2026
Net income ifrs-full:ProfitLossAttributableToOwnersOfParent FY 2025 -$87,446,000 SEC XBRL, as filed 40-F · 30 Mar 2026
EPS (basic) ifrs-full:BasicEarningsLossPerShare FY 2025 $-0.33 SEC XBRL, as filed 40-F · 30 Mar 2026
EPS (diluted) ifrs-full:DilutedEarningsLossPerShare FY 2025 $-0.33 SEC XBRL, as filed 40-F · 30 Mar 2026
Operating cash flow ifrs-full:CashFlowsFromUsedInOperatingActivities FY 2025 -$3,945,000 SEC XBRL, as filed 40-F · 30 Mar 2026
Capital expenditure ifrs-full:PurchaseOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities FY 2025 $69,240,000 SEC XBRL, as filed 40-F · 30 Mar 2026
Cash and equivalents ifrs-full:CashAndCashEquivalents FY 2025 $129,783,000 SEC XBRL, as filed 40-F · 30 Mar 2026
Shares outstanding dei:EntityCommonStockSharesOutstanding FY 2025 320,418,782 SEC XBRL, as filed 40-F · 30 Mar 2026

Annual figures only: this company files no quarterly XBRL with the SEC.

Seven-year statement history

Each fiscal year as the company first filed it with the SEC, in the currency it filed, never converted.

Statement lineFY2025FY2024FY2023FY2022FY2021FY2020FY2019
Revenuenot available$100,188,000$89,562,000, restated in a later filing$85,016,000$44,804,000, restated in a later filing$27,883,000$58,410,000
Operating incomenot availablenot availablenot availablenot availablenot availablenot availablenot available
Net incomenot available-$44,947,000, restated in a later filing-$34,958,000-$43,104,000-$157,674,000-$25,153,000-$32,653,000
Operating cash flownot available-$3,068,000-$1,013,000-$1,179,000-$50,945,000-$18,921,000$14,143,000
Capital expenditurenot available$18,850,000$19,941,000$19,602,000$12,646,000$11,571,000$11,554,000
Cash and equivalentsnot available$20,002,000$2,061,000$1,964,000$2,900,000$4,705,000$19,998,000
Debtnot availablenot availablenot availablenot availablenot availablenot availablenot available
Dividend per sharenot availablenot availablenot availablenot availablenot availablenot availablenot available
Sourcenot available6-K · 27 Mar 202540-F · 30 Mar 20266-K · 29 Mar 20246-K · 15 Mar 20236-K · 17 Mar 20226-K · 22 Mar 20216-K · 9 Mar 2020
  • A dash means the SEC filings carry no figure for that year. It is never zero.
  • * The figure as first filed; restated in a later filing.

Filings

DateSource
14 Aug 20266-K(14 Aug 2026)
14 Aug 20266-K(14 Aug 2026)
11 Aug 20266-K(11 Aug 2026)
23 Jul 20266-K(23 Jul 2026)
15 Jul 20266-K(15 Jul 2026)
15 Jul 20266-K(15 Jul 2026)

How to read this page

Costs are the company's own consolidated all-in sustaining cost (gold, silver) or C1 cash cost (copper), as stated, on the basis the company states; the reference price is the quarter's average from World Bank Commodity Price Data (CC BY 4.0); the margin is that price less the stated cost, a production-cost spread and not company net profit; financials are as filed in the filing currency, never converted; report dates are confirmed from the company's notice or estimated from its own past pattern and say which. The full methodology is on the Miner Margins page.