Trekor Metals Ltd share price
- Latest C1 cash cost$3.14/lbrelease
- Copper produced, attributable19,813source
- Next report14 Octprior report
Company-reported data · Fixed cohorts · No estimated costs
How to read these figures
- Primary sources: every figure is the company's own, cited to the release or filing it came from.
- Fixed cohorts: the companies in each median are set for the calendar year, so a median never moves because membership moved.
- No modelled costs: no cost or margin here is estimated by us; where a company states no figure, the page says so.
About Trekor Metals Ltd
Trekor Metals' principal operating asset is its wholly-owned Gibraltar Mine, a large copper mine located in central British Columbia. The company is headquartered in Vancouver, Canada, and is listed on the TSX, the NYSE American and the LSE. It was incorporated on April 15, 1966 under the Company Act (British Columbia). In 2025, Gibraltar produced 98 million pounds of copper and 1.9 million pounds of molybdenum. Gibraltar had Proven and Probable Sulphide Mineral Reserves of 587 million tons at a grade of 0.25% copper as of December 31, 2025. Florence Copper production utilizes in-situ copper recovery to produce London Metal Exchange grade A copper metal without conventional open-pit mining or major surface disturbance. As at December 31, 2025, the company had 284 full-time salaried employees, 677 hourly employees and 2 contractors.
Costs and margins
- Price, quarter average
- $4.32/lb
- C1 cash cost
- $3.14/lb
- C1 margin
- $1.18/lb
- C1 margin, % of price
- 27.3%
Latest C1 cash cost $3.14 per pound. Copper miners: median C1 cash cost $1.91 per pound, Q2 2025, 8 reporters. 8 lowest of 8 copper miners reporting Q2 2025.
| Category | Copper price (quarterly average) | C1 cash cost |
|---|---|---|
| Q2 2025 | $4.32 | $3.14 |
C1 cash cost and the average copper price by quarter, newest first, US$ per pound; every row cites the company's own release.
| Quarter | Price avg | C1 cash cost | C1 margin | C1 margin % | Source |
|---|---|---|---|---|---|
| Q2 2025 | $4.32 | $3.14 | $1.18 | 27.3% | release |
Its panel on the Miner Margins page carries the cohort it sits in and the basis notes.
Production and guidance
Q2 2025, as reported
- Copper produced, attributable
- 19,813 000's pounds
- Realized copper price
- 4.32 US$ per pound
Trekor Metals's mines and operations
| Ownership | Jurisdiction | Status | Source | |
|---|---|---|---|---|
| Gibraltar Mine | 100% | British Columbia, Canada | Not available | 40-F (filed 31 Mar 2026); fiscal year 2025 |
| Florence Copper | Not available | Arizona | Not available | 40-F (filed 31 Mar 2026); fiscal year 2025 |
| Yellowhead Copper Project | Not available | British Columbia, Canada | Not available | 40-F (filed 31 Mar 2026); fiscal year 2025 |
| New Prosperity Project | 77.5% | British Columbia | Not available | 40-F (filed 31 Mar 2026); fiscal year 2025 |
| Aley Project | Not available | Not available | Not available | 40-F (filed 31 Mar 2026); fiscal year 2025 |
| Harmony Gold Project | Not available | Graham Island in Haida Gwaii | Development-stage | 40-F (filed 31 Mar 2026); fiscal year 2025 |
Financials, as filed
Key financials
- Revenue
- CAD 672.9M
- Net income
- -CAD 30.1M
- Operating cash flow
- CAD 219.6M
- Cash and equivalents
- CAD 188.0M
- Debt
- CAD 747.0M
- EPS (diluted)
- CAD -0.09
Rounded from the figures as filed; the exact figures, concepts and filings are below.
Figures as filed, with concept, provenance and filing
| Measure | Period | Value | Provenance | Filing |
|---|---|---|---|---|
| Revenue ifrs-full:Revenue | FY 2025 | CAD 672,904,000 | SEC XBRL, as filed | 40-F · 31 Mar 2026 |
| Net income ifrs-full:ProfitLoss | FY 2025 | -CAD 30,076,000 | SEC XBRL, as filed | 40-F · 31 Mar 2026 |
| EPS (basic) ifrs-full:BasicEarningsLossPerShare | FY 2025 | CAD -0.09 | SEC XBRL, as filed | 40-F · 31 Mar 2026 |
| EPS (diluted) ifrs-full:DilutedEarningsLossPerShare | FY 2025 | CAD -0.09 | SEC XBRL, as filed | 40-F · 31 Mar 2026 |
| Operating cash flow ifrs-full:CashFlowsFromUsedInOperatingActivities | FY 2025 | CAD 219,558,000 | SEC XBRL, as filed | 40-F · 31 Mar 2026 |
| Cash and equivalents ifrs-full:CashAndCashEquivalents | FY 2025 | CAD 187,961,000 | SEC XBRL, as filed | 40-F · 31 Mar 2026 |
| Debt ifrs-full:Borrowings | FY 2025 | CAD 746,996,000 | SEC XBRL, as filed | 40-F · 31 Mar 2026 |
| Shares outstanding dei:EntityCommonStockSharesOutstanding | FY 2025 | 361,099,176 | SEC XBRL, as filed | 40-F · 31 Mar 2026 |
Annual figures only: this company files no quarterly XBRL with the SEC.
Seven-year statement history
Each fiscal year as the company first filed it with the SEC, in the currency it filed, never converted.
- A dash means the SEC filings carry no figure for that year. It is never zero.
- * The figure as first filed; restated in a later filing.
Filings
| Date | Source |
|---|---|
| 19 Aug 2026 | 6-K(19 Aug 2026) |
| 6 Aug 2026 | 6-K(6 Aug 2026) |
| 6 Aug 2026 | 6-K(6 Aug 2026) |
| 30 Jul 2026 | 6-K(30 Jul 2026) |
| 14 Jul 2026 | 6-K(14 Jul 2026) |
| 7 Jul 2026 | 6-K(7 Jul 2026) |
How to read this page
Costs are the company's own consolidated all-in sustaining cost (gold, silver) or C1 cash cost (copper), as stated, on the basis the company states; the reference price is the quarter's average from World Bank Commodity Price Data (CC BY 4.0); the margin is that price less the stated cost, a production-cost spread and not company net profit; financials are as filed in the filing currency, never converted; report dates are confirmed from the company's notice or estimated from its own past pattern and say which. The full methodology is on the Miner Margins page.